Notice ID: b8bafadfee084f15a3826e756d9d9581Solicitation
Kewaunee Demo
Archived on March 19, 2022. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 12:00 PM UTC−06:00
- Posted
- March 3, 2022
- Notice type
- Solicitation
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- NAICS
- 238910: Site Preparation Contractors
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W072 ENDIST CHICAGO
- Place of performance
- Kewaunee, 54216
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W912P622Q0003
- Notice ID
- b8bafadfee084f15a3826e756d9d9581
Description
This is a Request for Quote (RFP) to furnish all labor, materials, supplies, tools, and equipment necessary to complete the Building Demo/Removal and restoration at the USACE Kewaunee Area Office. There are three (3) existing, currently unoccupied buildings (5503, 5504, and 5508) to be removed, including the foundation to a depth of one foot below the ground surface. Work includes abatement of asbestos and lead-based paint as needed, and the identification and proper disposal of old light fixtures, appurtenances, and existing building features as needed, according to drawings and statement of work.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
maria anguiano
Documents
No documents available.
Lifecycle
Solicitation:
W912P622Q0003- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 5×
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
*****Amendment 00010**** The purpose of this amendment is to notify offerors of the removal of Clause 252.215-7993, Proposal Adequacy Checklist and to notify Offerors that CMMC information is required at Task Order level. The MSDS selection referenced IAW FAR 52.223-3, was included in error and is not applicable at the base contract level. ****FINAL Solicitation Amendment 0003- The purpose of Amendment 0003 to the Final Solicitation is to notify that Section C has been removed from the solicitation document and is now provided as Attachment 21. Additionally, this amendment provides updated revisions for Attachment 17 (Estimated Quantities), Attachment 18 (Section L), and Attachment B, as well as provide FRP Contractor Questions and Answers dated 08 September 2026. The Amended Solicitation has also been provided. THESE ARE NOTED CHANGES, HOWEVER, IT IS THE OFFERORS RESPONSIBILITY TO REVIEW THE AMENDMENT IN ITS ENTIRETY AND IDENTIFY ALL CHANGES. THE SUBMISSION RESPONSE DATE IS 24 September 2026***** | - | Solicitation | 09/24/2026 |
/// AMENDMENT 3:The purpose of this amendment is to add Attachment 5 Pre-Demolition Survey and add the following verbiage to PWS Paragraph 5.1: Attachment 5 Pre-Demolition Survey is the ACM conducted in 2011 which indicated possible Asbestos in the building. Two additional asbestos surveys were later conducted finding no record of asbestos in the building. Per Fort Drum environmental engineers, this meets NYS Code Rule 56 and no additional pre-demolition surveys are required. All other terms and conditions remain the same. END AMENDMENT 3. /// ///AMENDMENT 2: The purpose of this amendment is to post the Questions and Answers and extend the quote due date from 31 July 2026 to 07 August 2026 at 10:00 AM Eastern time. Attachment 1 Performance Work Statement is updated adding paragraphs 5.2.1.14 and 5.2.4. Attachment 3 500 Area Drawings is updated to include a slide showing the area required to be fenced. Attachment 4 Test Results is added providing the results of the environmental testing of the site. All other terms and conditions remain the same. END AMENDMENT 2///AMENDMENT 1: The purpose of this amendment is to add Attachment 3 500 Area Drawings. All other terms and conditions remain the same. END AMENDMENT 1/// Fort Drum, New York has a requirement for WWII Building Demolition. This requirement is set-aside 100% small business set aside under NAICS 238910 Site Preparation Contractors, size standard is $19 million. A site visit will be conducted on 23 July, 2026 at 1:00 PM Eastern time. The meeting place will be held in Conference Room 103, located at 4205 Po Valley Rd, Fort Drum, NY 13602. To access Fort Drum, contractors shall be restricted to physically sign in at Paul Cerjan Gate for entry, unless they have a Department of Defense (DoD) issued ID card, a local temporary pass, or a local access badge (LAB). For contractors who do not have access will need to visit the welcome center Bldg. 11008 outside of Paul Cerjan (Main) gate with a picture identification (must be Real ID compliant), registration, and proof of insurance to gain a one-day pass. The visitor center is open 5:30 a.m. to 10:00 p.m. seven days a week. Offerors MUST notify the Contracting Officer and Contract Specialist by email of intent to attend the site visit no later than 23 July, 2026 at 10:00 AM Eastern Time. Questions are due no later than 27 July, 2026, at 10:00 AM Eastern time. Quotes are due on 31 July, 2026 at 11:00 AM Eastern Time. The Offeror shall provide all information and requirements listed in Addendum to FAR 52.212-1 on page 22 of this solicitation. All quotes shall be submitted electronically via the PIEE Solicitation Module. Quoters shall nominate a Proposal Manager in the PIEE Solicitation Module. The Proposal Manager shall respond and post quotes to this solicitation in the PIEE Solicitation Module. For information and training on how to add the role to the quoter?s profile, the functions of the Proposal Manager, and how to post an offer/bid/quote, go to https://piee.eb.mil/. Log on to PIEE; select Help; select New User Information and Help; select Web Base Training. | - | Solicitation | 08/07/2026 |
The purpose of this amendment is to extend the proposal submission deadline from 15 July 2026 to 27 July 2026.PRE-DEMOLITION SURVEY VARIOUS BUILDINGS Marine Corps Air Station in Yuma, Arizona. The objective of this Performance Work Statement (PWS) is to plan and complete the environmental sampling of excess facilities at the specified installation. The structures of concern are listed in Table I. The sampling will identify and determine the extent of Asbestos-Containing Materials (ACM) and Other Regulated Materials (ORM). Additionally, the Contractor shall complete a Waste Stream Analysis for RCRA 8 metals, Lead-Based Paint (LBP), and PCBs-in-paint for those parts of the structure currently identified as potentially having painted components. Following sampling, the Contractor shall be able to characterize and quantify the environmental contamination present to the extent necessary for demolition planning and waste disposal profiling. The Contractor shall identify the methods required to abate, remove, and dispose of said contamination in a safe manner. All sampling shall be planned and performed in accordance with applicable Federal, State, and local regulations. All recommendations for follow-on actions shall also be in accordance with Federal, State, and local regulations. The results of the site investigation and sampling effort will be provided in a comprehensive Pre- Demolition Assessment Report encompassing all assessed facilities. The Contractor?s proposed schedule, submitted with their proposal, shall establish the timeline for laboratory testing, analysis, and the final report submittal. The intent of this contract?s effort is to provide comprehensive sampling for all ACM/ORM materials, including the facility exterior, roof, basements, and crawl spaces. The Contractor shall make every reasonable effort to access these areas when present in each facility. The Report will specifically address any areas within the structures that were not accessible during the survey, detailing the size of the area not accessed and the current or immediate previous use of the area not sampled. | - | Solicitation | 07/27/2026 |
Amendment 0005 to add Questions and Answers, Attachment 18_ECS-000 - Construction Plans - Specifications and As-built Record Drawings, Attachment 19_BDA-Aviation-II-As-Built-Drawings-vol-1, and update PWS Paragraph 5.3.1 from (5.3.1. The BRK facilities, 1-25 are two story structures that are approximately 28-7 in height and approximately 97-4 in width, with metal siding and roofing panels. There is an attached pressure-treated deck providing entrance to the first level, which contains a laundry room, two kitchenettes, two bathrooms, six bedrooms, stairwell and a concrete slab on grade mechanical room with exterior access only. The second level mirrors the first with the only exception being there is interior access to the mechanical room. Each level is approximately 3,168 sq ft. Refer to attachments 3, 4 and 5 for structural information) to (5.3.1. The BRK Facilities 1 through 25 are two-story structures measuring approximately 97?4 wide, 33 long, and 28?7 high. Constructed with metal siding and roofing, each facility is built on a 4,400 sq ft concrete slab. There is an attached pressure-treated deck providing entrance to the first level, which contains a laundry room, two kitchenettes, two bathrooms, six bedrooms, stairwell and a mechanical room with exterior access only. The second level mirrors the first with the only exception being there is interior access to the mechanical room. Each level is approximately 3,168 sq ft. Refer to attachments 1, 2 and 3 for structural information.) | - | Combined Synopsis | 06/15/2026 |
The US Army Corps of Engineers, Engineering and Support Center, Redstone Arsenal, AL, has been tasked with initiating a Facility Reduction requirement at the USMC, Twentynine Palms, California.Pre-Demolition Surveys according to the requirements set forth in the Performance Work Statement (PWS) is for various buildings at the site. The objective is to plan and complete the environmental sampling of facilities at the installation. The structures of concern are listed in Table I. The sampling will determine ACM and ORM materials and complete a Waste Stream Analysis for RCRA 8 metals, lead-based paint (LBP) and PCB?s-in-paint for those parts of the structure currently identified as potentially having any painted components. Following sampling, the Contractor shall be able to completely quantify the environmental contamination present and the methods required to remove and dispose of said contamination in a safe manner. All sampling shall be planned and performed in accordance with Federal, State, and local regulations for the installation. All recommendations for follow-on actions shall also be in accordance with Federal, State, and local regulations. Laboratory testing and analysis shall be completed within the workdays identified in table two following the respective site sampling field activity completion. The results of the site investigation and sampling effort will be provided in an individual Pre-Demolition Assessment Report for the installation that will be submitted within the workdays identified in table two following the receipt of sample results. The intent of this contract effort is to provide comprehensive sampling for all ACM/ORM materials to include the facility exterior, roof, basement/crawl spaces, etc. The Contractor shall make every reasonable effort to access these areas when present in each facility. The Report will specifically address any areas within given structures that were not accessible during the survey and state the size of the area not accessed, and current or immediate previous use of the area not sampled. | - | Solicitation | 05/07/2026 |
Additional Details
Solicitation Number
W912P622Q0003
Archive Date
Mar 19, 2022
Office Address
CHICAGO, IL, 60604-1437